The essentialsChoose the kitchen layout before the cabinet order
Kitchen renovation should answer how the room will work before cabinetry is ordered. Record the appliances, the storage you need and the route between food preparation, cooking and washing. Keeping the existing arrangement and changing the layout are different proposals: moving a sink, vent or wall can add work beyond the kitchen's visible surfaces. Use this service to define the full room scope, from removal and preparation to cabinet, counter and final connection responsibilities. Existing cabinet painting is a narrower finish option when the layout and components remain suitable. For a full renovation, confirm exact product dimensions, adjoining floor boundaries and temporary cooking arrangements before fabrication or demolition dates are agreed.
Items to include in the kitchen brief
- Existing kitchen measurements and appliance schedule
- Cabinet layout and storage review
- Countertop and backsplash interfaces
- Lighting and specialist-trade coordination
- Temporary kitchen and installation sequence
Cabinet, appliance and layout decisions
Working paths around cabinets and appliances
Review the room with doors and drawers shown open, including the refrigerator and dishwasher. An island should leave a useful route between entrances and work areas without turning the main preparation surface into a passage. Consider who uses the kitchen together and which storage needs easy access. Measurements should reflect actual walls and finished surfaces, especially where an older room is uneven or out of square.
Specifications that control fabrication
Appliance cut-outs, door swings, sink mounting and counter support affect the cabinet drawings. Confirm the exact products and their installation information before releasing orders. Discuss fillers, side panels, exposed ends and transitions to the ceiling because these details determine the finished appearance. A late appliance substitution can affect more than one opening, so establish who checks changes against cabinetry, electrical supply, ventilation and counter fabrication.
Keeping the layout or moving services
Retaining plumbing and ventilation positions can simplify a refresh when the layout already works. Moving a sink, range or wall may improve use but adds dependencies on the structure and service routes. Compare those benefits with the investigation and reinstatement needed in adjacent rooms. Identify flooring beneath existing cabinets and decide whether new flooring runs continuously or stops at a planned boundary before setting cabinet heights.
Details worth discussing

Work zones and storage
Describe your appliance positions, everyday preparation space and storage priorities. Ask the proposal to distinguish cabinetry, counters, lighting and any changes to plumbing or electrical connections.
Explore bathroom renovationTurn the kitchen brief into installation decisions
Bring the appliance list and the room's working problems
List appliance models already selected and explain what fails in the current kitchen: limited preparation space, awkward doors, poor storage or a congested route. Photograph the walls, service points and adjoining rooms, and bring any measured plans. Mark cabinets or flooring to retain. Ask whether the proposal keeps the existing layout or changes walls and service positions. Confirm who checks appliance specifications against cabinet drawings and who coordinates plumbing, electrical and ventilation work. Include owner-supplied items and the facilities needed while the kitchen is unavailable so the proposal covers both the finished room and its installation sequence.
Coordinate removal, rough-in and fabrication dates
Confirm applicable approval and trade requirements before removal. Protect the route used for appliances and arrange a place for delivered cabinets. Coordinate rough-in positions with approved drawings, then identify when the counter can be measured from installed cabinets. Allow for the gap between counter templating and installation. Set responsibility for appliance connection, backsplash completion and final adjustments so the schedule covers the entire usable kitchen.
Check storage and equipment in normal operation
At handover, open every door and drawer and review clearances around handles, panels and adjacent appliances. Check the visible counter junctions, sink edges and backsplash termination against the agreed details. Ask the appropriate trades to explain controls and connections within their scope. Record adjustment items and product care information, including any restrictions on new finishes, before loading cupboards and returning the kitchen to full use.
Kitchen scope and specification questions
Should appliances be selected before cabinets?
Yes, final specifications should be available before cabinet fabrication. Refrigerators, cooktops, wall ovens and dishwashers have model-specific installation requirements. Planning from a generic appliance width can cause clearance and panel-fit problems.
Can the sink or stove move to an island?
Possibly, after a review of the proposed layout and the services required. Plumbing, ventilation, electrical work and any structural constraints must be assessed. The proposal should distinguish layout design from authorization to perform regulated trade work.
Should I compare cabinet painting with a kitchen renovation?
Compare the change you need. Painting can refresh suitable existing components while keeping their dimensions and layout. A renovation may change storage, cabinetry, appliances, surfaces or service positions. Record defects and working-space problems first, then ask which option addresses them. Keep the component and trade responsibilities clear in either proposal.
When is a countertop measured?
The fabricator should confirm its requirements. Final measurements commonly depend on cabinets being installed in their agreed positions. Confirm who coordinates the visit and what must be ready so a provisional drawing is not mistaken for a fabrication measurement.
Who handles a late appliance change?
Identify one coordinator who checks the replacement specifications with the cabinet supplier, counter fabricator and relevant trades. Obtain approval for affected drawings and costs before ordering. The same nominal appliance width does not establish an identical fit.
Kitchen planning and consumer references
Check current requirements with the relevant authority for your property and scope.
- When do I need a building permit? ↗City of Toronto
- Building renovator business licensing ↗City of Toronto
- Your rights when starting home renovations or repairs ↗Government of Ontario
Planning guide updated . Scope and site conditions need individual assessment.